![427cc266e88b6dead3809e26708f558](http://www.yhr-tanks.com/uploads/427cc266e88b6dead3809e26708f5581.jpg)
CHINA | CSTR Reactor for Food Waste Project
Construction Time: 2021,
Roof: Glass-Fused-to-Steel Roof and Double Membrane Gas Holder Roof
![20210712172409](http://www.yhr-tanks.com/uploads/微信图片_20210712172409.jpg)
Malaysia | Potable Water Tank Project
Construction Time: 2021,
Tank Dimension: Φ10.7*3.6m (h)*3, Φ6.11*3.6m (h)*3.
![GC21-003-xiao](http://www.yhr-tanks.com/uploads/GC21-003-xiao1.jpg)
Hebei, CHINA | Biogas Tank Project
Construction Time: 2020,
Tank Dimension: Φ17.57*16.2m (h).
![mmexport1630152161616-3m](http://www.yhr-tanks.com/uploads/mmexport1630152161616-3m1.jpg)
Jiangsu, CHINA | Wastewater Tank Project
Construction Time: 2021,
Tank Dimension: Φ8.6*6m (h)*28.
![5981628152393_.pic_hd](http://www.yhr-tanks.com/uploads/5981628152393_.pic_hd.jpg)
Iraq | Potable Water Tank Project
Construction Time: 2021,
Tank Dimension: Φ6.88*9m (h)*2.
![WechatIMG742](http://www.yhr-tanks.com/uploads/WechatIMG742.jpeg)
Cuba | Nestle Group Potable Water Tank Project
Construction Time: 2020,
Tank Capacity: 700 m³*2,
Tank Dimension: Φ9.17*11.4m (h)*2.
![8](http://www.yhr-tanks.com/uploads/山东乐陵胜利新能源生物天然气项目.jpg)
Shandong, China | Shengli Biogas Digester Project for Straw Biogasification
Roof Type: Membrane Roof;
Capacity: Ø23.68*7.2 m(H)*3, Ø23.68*6.84 m(H)*3;
Installation time: 2013.